Singapore denies power cut caused causeway jam, blames maintenance, breakdowns

Singapore’s Immigration and Checkpoints Authority (ICA) on Thursday rejected a report that a power outage at Woodlands Checkpoint caused traffic congestion along the causeway and on several roads in Johor Bahru on Wednesday.

In its account of Wednesday’s events, ICA said a build-up of Singapore-bound traffic occurred amid planned electrical maintenance works, while two vehicle breakdowns on the Malaysian side of the causeway subsequently contributed to traffic tailing back into Malaysia.

Malaysian newspaper The Star had earlier reported that the congestion, which it said began at about noon on Wednesday, was caused by a “massive power outage” at Woodlands checkpoint.

  

​Read More

Leave a Reply