China’s Belt and Road Hit Hard Again; Indonesian Project Delayed Wages, Hundreds Protest

On May 12, a soundless video suddenly went viral across the Chinese internet. Under the blazing sun, a group of Chinese construction workers stood outside a halted nickel smelting plant in Indonesia. This was not a documentary — it was footage from a real collective strike at the Indonesian Mitra Murni Perkasa (MMP) Rotary Kiln-Electric Furnace (RKEF) nickel smelting project, built by China National Chemical Engineering Sixth Construction. Since the end of 2024, these workers have not received a single paycheck, pushing their lives to the brink.
Join this channel to get access to perks:
https://www.youtube.com/channel/UCT2kPBcD6tXn8TP_aV7BmgA/join

#chinaobserver
All rights reserved.
⭐You can support us at: https://donorbox.org/china-observer-supporting-independent-news
⭐For business cooperation, please contact us: business@chinaobserver.co